WATCH: North Stand Terracing Bolts Along

Work on installing the concrete terracing units is quickly shaping the internal shape of the north stand.

Over half of the upper tier is now in place, with some of the lower tier also emerging one month ahead of the expected installation of the initial roof trusses.

VIEW OUR LATEST STADIUM UPDATE VIDEO ABOVE OR BY CLICKING HERE

Meanwhile, with the south stand now connected fully to the south east core, the final lattice planks are being installed on the top level.

Concrete raker beams can now be seen in place across the lower length of the east stand, mirroring those previously installed on the west stand, where the temporary ground floor supports are now being removed to reveal the vast floor space.